The emergency power system for the DEEP DRILLER should be placed in operation when the weather forecast predicts winds greater than 90 knots and when __________________.
A
evacuating the unit
B
ballasting
C
deballasting
D
unexpected list and trim exist
E
İlgili Sorular
In the United States, the load line markings are set by the __________.In ship construction, frame spacing is __________.A tanker loads at a terminal within the tropical zone. She will enter the summer zone 6 days after d...Beyond the area of state ownership in the U.S. outer continental shelf, the right to drill is contr...Under normal conditions a liferaft is released from its§cradle by ___________.