A tanker loads at a terminal within the tropical zone. She will enter the summer zone 6 days after departing the loading port. She will burn off about 45 tons/day and daily water consumption is 8 tons. How many tons may she load over that allowed by her summer load line?
A
270
B
278
C
291
D
318
E
İlgili Sorular
What are the two main types of stud link chain?When tank cleaning with a portable machine, the weight of the machine is suspended from __________.BOTH INTERNATIONAL & INLAND Which vessel does NOT sound a fog signal of one prolonged followed by tw...In order to initiate CPR on a drowning victim, ________________________.When anchoring in a clay bottom, what is one hazard that may cause the anchor to drag?