The COASTAL DRILLER is loaded as shown in the Sample Load Form #1 (Rig Move). If the entire contents of bulk tanks #2 and #3 are back-loaded to an offshore supply vessel, what transverse moment would have to be created to level the unit in list at the new draft?

A
-3,604 ft-kips
B
-4 ft-kips
C
3,470 ft-kips
D
7,088 ft-kips
E