The COASTAL DRILLER is loaded as shown in the Sample Load Form #1 (Rig Move). What is the new VCG if the entire contents of drill water tanks 6 and 7 are discharged?

A
38.00 feet
B
48.38 feet
C
49.16 feet
D
65.00 feet
E