Before operating a towboat greater than 100 gross tons it must have a fixed piping system to discharge oily mixtures ashore. This system must include_______________.

A
approved oily-water separating equipment
B
a fixed or portable containment system at the shore connection
C
a spare pump in case the main pump is inoperative
D
at least one outlet accessible from the weather deck
E