When evacuating the DEEP DRILLER, preparations should include ________.
A
putting the unit at transit draft
B
activating the emergency power system
C
jettisoning all combustible materials
D
removing all tension from the mooring lines
E
İlgili Sorular
Repairing damage to the hull at or above the waterline reduces the threat of __________.Temporary Certificates of Inspection for offshore drilling units are effective until the ___________...Life floats and buoyant apparatus shall be marked _______. §(small passenger vessel regulations)The retrievable subsea units that contain the pilot valves and regulators for operating the subsea b...You are enroute to assist vessel A. Vessel A is underway at 5.5 knots on course 033°T, and bears 28...