When evacuating the DEEP DRILLER, preparations should include ________.
A
putting the unit at transit draft
B
activating the emergency power system
C
jettisoning all combustible materials
D
removing all tension from the mooring lines
E
İlgili Sorular
On a vessel of 5,000 tons displacement there are two slack tanks of acid (SG 1.8). Each tank is 30 f...When loading bulk liquid cargo, what is the first action you should take if a cargo valve jammed ope...You are landing a single-screw vessel, with a right-hand propeller, starboard side to the dock. Whe...A vessel must have one approved ring life buoy on board if its length is over how many feet?What determines the minimum size of an anchor buoy?