Your vessel is damaged, and there is no list or trim. §The rolling period is short. The freeboard before the§damage was 12'02" (3.7 meters). It is now reduced to§3'00"(1 meter). Which action would you take FIRST?
A
Press up a slack centerline double bottom tank
B
Pump out an amidships centerline ballast tank
C
Transfer ballast from the peak tanks to an amidships centerline tank
D
Pump out the marine potable tank located on the starboard side amidships
E
İlgili Sorular
The time meridian used when computing the height of tide for Pensacola Bay, FL, is __________.Which statement is TRUE concerning vessels over 1600 gross tons certificated for service solely on t...On an anchor windlass, the wheel over which the anchor chain passes is called a __________.You are on a 30,000 DWT tankship engaged in trade to another country signatory to MARPOL 73/78. Whic...Multi-year ice is the hardest sea ice and should be avoided if possible. It is recognizable because...