You have orders to drop off a barge loaded with propylene oxide at a fleet. In doing so, you must ensure that ______.
A
all wing voids and rakes are pumped dry before tying off the barge
B
the barge is moored next to the bank where it will be protected from a possible collision
C
the barge is under the care of a watchman
D
a rake end is facing upstream to minimize the effect of current on the mooring lines
E
İlgili Sorular
Your vessel displaces 740 tons and measures 141'L by 34'B. What is the reduction in GM due to free s...A safety shackle is identified by its __________.What is the purpose of the intermediate spring?A List of Lights entry (L Fl) is a single flashing light which shows a long flash of not less than _...During one synodic rotation, a body makes one complete turn relative to the __________.