You are making a heavy lift with the jumbo boom. Your vessel displaces 8390 T. The 40 ton weight is on the pier and its center is 55' to starboard of the centerline. The head of the boom is 110' above the base line and the center of gravity of the lift when stowed on deck will be 45' above the base line. As the jumbo boom takes the strain the ship lists to 3.5°. What is the GM with the cargo stowed?
A
4.58 feet
B
4.27 feet
C
3.93 feet
D
3.68 feet
E
İlgili Sorular
With the sprinkler system and air system on and all hatches shut, the survival craft will provide pr...Another name for the garboard strake is the __________.A message giving warning of a hurricane should have which prefix when sent by radiotelephone?Deficient oxygen content inside a chain locker can be detected with ______________________.Current refers to the __________.