You are berthed at a cargo facility where you have just completed discharging a dangerous cargo from your barge. You must complete topside repairs on the barge involving hot work before sailing. Which statement is TRUE?
A
You can make repairs with permission of the facility owner since you are empty and the cargo is on the facility.
B
The repair area must be inspected by a marine surveyor to ensure that it can be done safely.
C
Hot work repairs at such a facility are prohibited.
D
The Captain of the Port may give specific approval to make hot work repairs.
E
İlgili Sorular
In the celestial equator system of coordinates what is equivalent to the longitude of the Earth syst...INLAND ONLY A power-driven vessel, when leaving a dock or berth, must sound what signal?Aboard the DEEP DRILLER, to use the drill water pump to supplement the bilge pumps, it is necessary...On offshore drilling units fitted with CO2 systems, each space that contains a cylinder must be vent...BOTH INTERNATIONAL & INLAND A vessel which is fishing is required to show sidelights and a sternligh...