While the DEEP DRILLER is loaded as shown in Sample Form #4 (Drilling), casing is accidentally dropped over the starboard side. Because the sounding level and starboard inclination are rapidly increasing, you decide that tank 1S is damaged. Your best countermeasure is to _____.
A
deballast from tank 2S
B
dump the mud
C
counterflood into 9P
D
place a wooden plug into the vent of tank 2S
E
İlgili Sorular
What is NOT characteristic of the conditions which would be experienced by a vessel located south of...An instrument designed to maintain a continuous record of atmospheric pressure is a(n) __________.On offshore drilling units, sleeping spaces for the regular personnel employed on board may not bert...The height of the tide at low water is 0.0 feet. The range is 9.0 feet. The duration is 06h 00m. ...You are planning a voyage from San Francisco to Japan. Which publication contains information on the...