While the DEEP DRILLER is loaded as shown in Sample Form #4 (Drilling), casing is accidentally dropped over the port side. Because the tank sounding level and port forward inclination are rapidly increasing, you decide that tank 1P is damaged. Your best countermeasure is to _____.
A
deballast from tank 2P
B
dump the mud
C
counterflood into 9S
D
counterflood into C3S
E
İlgili Sorular
Each fire pump on a MODU must have a pressure gauge located at _______.When making VHF radio calls to nearby stations, what level §of transmitting power should you use?A plane perpendicular to the polar axis will never form what line on the Earth's surface?When crossing the magnetic equator the __________.A bridge over a navigable waterway is being repaired. There is a traveller platform under the bridg...