While on a normal tow, the COASTAL DRILLER is threatened with the approach of a severe storm. Including the time required to place the generators on-line, the approximate time required to lower the legs from a TOC (tip-of-can) position of 1.20 feet to 60.50 feet is _____.

A
8 minutes
B
32 minutes
C
47 minutes
D
55 minutes
E