While on a normal tow, the COASTAL DRILLER is threatened with the approach of a severe storm. Including the time required to place the generators on-line, the approximate time required to lower the legs from a TOC (tip-of-can) position of 1.20 feet to 60.50 feet is _____.
A
8 minutes
B
32 minutes
C
47 minutes
D
55 minutes
E
İlgili Sorular
Your vessel (185 GT) is on a voyage between New York and San Francisco. Which statement is TRUE?Your sailing vessel is docked during a storm and is in continuous motion. If a mooring line parts du...What will happen when cargo is shifted from the main deck into the lower hold of a vessel?A line of position is __________.Reserve buoyancy is _________________.