While off-loading from an offshore supply vessel with the crane, the wind increases in strength and changes direction significantly, you should _________________.
A
expedite off-loading
B
stop off-loading, but keep the offshore supply vessel in the present location
C
continue off-loading with no changes
D
move the offshore supply vessel to the downwind side
E
İlgili Sorular
When a vessel is stationary and in a hogging condition, the main deck is under _____.What is an advantage of the 6X37 class of wire rope over the 6X19 class of wire rope of the same dia...Which instrument may a towing vessel, engaged in towing exclusively on the Western Rivers, use in pl...You must draw a plotting sheet covering latitudes 45°N to 49°N and longitudes 179°E to 178°W. If t...Injuries resulting in loss of life or incapacitation,§aboard vessels, must be reported to the ______...