While loaded as shown in the DEEP DRILLER Sample Load Form #4 (Drilling), all of the liquid mud is dumped. What is the new longitudinal free surface correction?
A
1.63 feet
B
1.65 feet
C
1.67 feet
D
1.69 feet
E
İlgili Sorular
Conditions for crossing a rough bar are usually best at __________.You are on a 30,000 DWT tankship engaged in trade to another country signatory to MARPOL 73/78. Whic...You are reading the draft marks in illustration D032DG. The water level is at the top of number 8. W...BOTH INTERNATIONAL & INLAND What dayshape is to be shown by a vessel aground?A vessel heading SW is on a course of __________.