While loaded as shown in the DEEP DRILLER Sample Load Form #4 (Drilling), all of the liquid mud is dumped. What is the new position of the longitudinal center of buoyancy?
A
0.00 feet
B
1.69 feet
C
2.25 feet
D
2.29 feet
E
İlgili Sorular
According to 46 CFR Subchapter T the definition of a ferry§includes vessels that ________.The annual survey for endorsement of a Load Line Certificate must be held within __________.How often are fire hoses required to be tested on a mobile offshore drilling unit?BOTH INTERNATIONAL & INLAND Which vessel is "underway" under the Rules of the Road?How is a navigation light identified on an Army Corps of Engineers navigation map?