While drilling loaded as shown in Sample Load Form #4 (Drilling), the DEEP DRILLER suffers an unexpected but slowly increasing port and aft inclination. The wind and waves are light. This inclination could have been caused by __________________.
A
the failure of mooring lines 2 and 3
B
the drilling crew dumping the mud
C
the drill string breaking
D
ballast tanks equalizing into tank 10P
E
İlgili Sorular
Coast Guard Regulations (46 CFR) require inflatable liferafts to be equipped with _______.If a vessel is sagging, what kind of stress is placed on the sheer strake?Which statement(s) is(are) TRUE?The DEEP DRILLER is observed to be level at a draft of 60.0 feet. At the same time, the calculated l...Initial stability is indicated by __________.