While discharging a cargo, the stripping of the tanks falls behind schedule. This would indicate the __________.
A
main pumps are working at a high discharge pressure
B
main pumps are leaving too much oil in the tanks
C
stripping pump is not primed
D
stripping line is cross-connected to the main line
E
İlgili Sorular
The thickness of a 30.6 pound plate is __________.At an angle of loll, the righting moment is ________.You have abandoned ship and are in charge of a lifraft or survival craft. How much water per day sho...How many self-contained breathing apparati are required aboard a 500 ton passenger vessel in river ...Signaling devices required on inflatable life rafts include a(n) ________.