When transferring personnel with a MODU crane, the weight of the loaded personnel carrier must not exceed ________.
A
1/2 of the static rated load at the lift radius
B
1/3 of the static rated load at the lift radius
C
1/2 of the breaking strength of the hoist rope times the parts of line used
D
1/3 of the breaking strength of the hoist rope times the parts of line used
E
İlgili Sorular
The major problem with Moon sights is the __________.A seaman may have all or part of his wages deposited by allotment to a bank or savings institution. ...The horizontal fore-and-aft movement of a vessel is called __________.Your vessel's drafts are: FWD 22'-04", AFT 21'-06". Use the information in Section 1, the blue pages...After reporting a casualty to a mobile offshore drilling unit, which record must be retained on boar...