When topping the booms with a single-span topping lift, as shown in illustration D002DG, which statement is TRUE?
A
Heave on the bull rope until topped, pass the stopper, and then shackle in the bull chain.
B
Run the bull line to the unused winches and stop off the line at the gypsyhead.
C
Heave on the bull rope until topped and then shackle the bull chain to the padeye.
D
Heave the topping lift on the topping lift winch and run the winch until topped.
E
İlgili Sorular
A flame screen __________.INLAND ONLY Which indicates the presence of a partly submerged object being towed?BOTH INTERNATIONAL & INLAND What is required of a vessel navigating near an area of restricted visib...When a semisubmersible rig under tow veers from side to side on its tow line, the best way of contr...The liquid mud tanks on your vessel measure 20'L by 18'B by 7'D. The vessel's displacement is 986 T ...