When topping the booms with a single-span topping lift, as shown in illustration D002DG, which statement is TRUE?
A
Heave on the bull rope until topped, pass the stopper, and then shackle in the bull chain.
B
Run the bull line to the unused winches and stop off the line at the gypsyhead.
C
Heave on the bull rope until topped and then shackle the bull chain to the padeye.
D
Heave the topping lift on the topping lift winch and run the winch until topped.
E
İlgili Sorular
Which safety check(s) should be made before letting go the anchor?An engine compartment gasoline fire requires which type of extinguisher?Your drafts are: FWD 26'-03", AFT 30'-08". Use the blue pages of the Stability Data Reference Book t...When oil is accidentally discharged into the water, what §should you do after reporting the discharg...Each commercial fishing vessel must have at least one immersion suit, exposure suit, or life preser...