When a marine surveyor is employed to assist in the move of a mobile offshore drilling unit, he ______________________.
A
becomes responsible for the safe movement of the rig
B
relieves the Offshore Installation Manager at the moment the rig is free from the bottom
C
must be designated as the person in charge of the rig
D
is a specialist who is hired to provide advice and guidance on aspects of the move
E
İlgili Sorular
The proper way to correct a mistake in the logbook is to __________.The depth of water on a chart is indicated as 23 meters. This is equal to __________.Which equipment is not required for a life float? (small §passenger vessel regulations)A vessel's bottom will be subjected to tension when weight is concentrated __________.Denebola is found in what constellation?