What is NOT a requirement of cargo piping installed in tank vessels carrying grade D or E cargo ONLY?
A
The cargo piping system shall be fixed.
B
Flanged joints shall be used for pipe sizes exceeding 2 inches in diameter.
C
Piping through bunker spaces may be run through a pipe tunnel.
D
Connections at bulkheads must be made so that the plating does not form part of a flanged joint.
E
İlgili Sorular
For the DEEP DRILLER, the maximum permissible offset which can be tolerated while drilling is _____...What may prevent a tug from tripping or capsizing when towing a large vessel?A rock and sand structure extending from the bank of the river toward the channel is known as a ____...You are underway at 5 knots and see on your radar a contact 10 miles directly astern of you. 12 min...The buoy indicated by the letter B in illustration D044NG is a __________.