The signal man assisting the crane operator has his arm extended and is pointing his finger in the direction to move the boom. This is the signal to __________.
A
extend
B
lower
C
hoist
D
swing
E
İlgili Sorular
A great circle crosses the equator at 157°W. It will also cross the equator at what other longitude...The international shore connection required on a MODU is designed to _________.You are in a channel inbound from sea. A daymark used to mark a channel junction when the preferred...The path that a vessel is expected to follow, represented on a chart by a line drawn from the point ...The DEEP DRILLER is loaded as shown in the Sample Load Form #1 (Transit). What is the new height of ...