The signal man assisting a crane operator has his arm extended, thumb pointing downwards, flexing fingers in and out. This is the signal to __________.

A
lower the boom and raise the load
B
lower the load and raise the boom
C
raise the boom and lower the load
D
raise the load and lower the boom
E