The full period of motion of the DEEP DRILLER while tripping is 10 seconds and the maximum pitch angle as seen on the inclinometers is 8 degrees. From the standpoint of critical motion, the motion is ____________.
A
unsatisfactory, place setback in the pipe racks
B
satisfactory, continue tripping
C
unsatisfactory, deballast to survival draft
D
satisfactory, place unit in standby
E
İlgili Sorular
Frapping lines are fitted to lifeboat davits to __________.According to 46 CFR Subchapter T, rigid plastic or other§non-metallic piping ____________.The distance between the surface of the liquid and the tanktop in a cargo tank is called __________.Who is responsible for insuring that the accommodations on a mobile offshore drilling unit are maint...INLAND ONLY Which of the following signals may be exhibited by a vessel trawling in close proximit...