The final inspection responsibility for seeing that a tank barge is provided with the required equipment and fittings in good and serviceable condition prior to loading cargo rests with the _____________________.
A
terminal operator
B
owner of the barge
C
tankerman or person in charge of loading
D
charterer through the Master of the towing vessel
E
İlgili Sorular
The SS NORTHLAND is loaded to drafts: FWD 17'-03", AFT 19'-03". The KG is 23.6 feet. Use the salmon...Fire protection regulations for towing vessels require that all crew members participate in drills a...Which statement about transmitting distress messages by radiotelephone is INCORRECT?A spherical buoy may be __________.The SS AMERICAN MARINER is ready to load the cargo listed. There is already 2865 tons of cargo on bo...