The equipment required to remove an on-deck oil spill on a barge transfering oil must either be carried on board or __________________.
A
on a tug standing by
B
available by contract with the shore facility
C
kept at the shoreside hose connection during transfer
D
kept in a protected shoreside location readily accessible
E
İlgili Sorular
The SS NORTHLAND is loaded to drafts: FWD 32'-04", AFT 34'-02". The KG is 31.5 feet. Use the salmon...BOTH INTERNATIONAL & INLAND If your vessel is the stand-on vessel in a crossing situation _________...The international body responsible for drafting the convention prohibiting marine pollution (MARPO...According to the Chemical Data Guide, which reactive group(s) is/are not compatible with the produc...Each EPIRB shall be tested using the integrated test circuit and output indicator every ___________.