The DEEP DRILLER may remain at operating draft instead of deballasting to survival draft when _________________.
A
critical motion limits have been exceeded
B
waves approach within two feet of the spider deck
C
the maximum wave height is greater than 64 feet
D
winds are less than 70 knots
E
İlgili Sorular
BOTH INTERNATIONAL & INLAND While underway in fog, you hear a prolonged blast from another vessel. ...The letter R followed by one or more numbers indicates _______________.BOTH INTERNATIONAL & INLAND When do the Rules require both vessels to change course?When a davit-launched raft is lowered from a MODU, upon becoming waterborne, the raft is released b...A series of trays with sieves that vibrate to remove cuttings from the circulating fluid in rotary ...