The DEEP DRILLER, loaded as shown in the Sample Load Form #4 (Drilling), discharges a non-liquid load of 275.8 long tons from a position 130 feet above the centerline. What is the improvement in KGT?
A
0.68 foot
B
0.99 foot
C
1.16 feet
D
2.07 feet
E
İlgili Sorular
Each vessel shall be dry-docked or hauled out at intervals §not to exceed 2 years if operated in sal...Your cargo vessel's Certification of Inspection expires 30 April 2002. One of your inflatable life r...On small passenger vessels bunks installed in overnight§passenger accommodation spaces _____________...When leveling the elevated COASTAL DRILLER, you may raise the low corner instead of lowering the hig...You have loaded a deck cargo, and the vessel has assumed a 5° list due to negative GM. Your salt wat...