The DEEP DRILLER is under tow at a 20 foot draft. The rig motions are close to exceeding the limits for critical pitch and roll. The rig is also experiencing occasional pounding on the horizontal braces. In this situation you should _________.
A
ballast down to a 45 foot draft and check vessel motions
B
wait until pitch and roll exceed the limits before ballasting down
C
ballast up to a 15 foot draft and check vessel motions
D
shorten the tow wire for a smoother tow
E
İlgili Sorular
You are making tow. A loaded, open-hopper barge with independent tanks has placards, with alternati...You will stop reporting to AMVER when __________.The COASTAL DRILLER, in transit with winds expected to exceed 70 knots, must lower the legs so that...Which is NOT a safety precaution to be observed during the loading of LFG?When a helicopter is lifting personnel from a rescue boat, the other individuals in the boat should ...