The DEEP DRILLER is on location during a storm. Windward anchor tensions begin to exceed the test tensions. To reduce tensions while minimizing offset over the well, you should ________________________.
A
increase tension on the leeward chain
B
pay out more chain on the windward side
C
reduce tension on the leeward chains
D
connect an emergency tow wire to the work boat
E
İlgili Sorular
The SS AMERICAN MARINER is ready to load the cargo listed. There is already 2464 tons of cargo on bo...A life float on a fishing vessel must be equipped with _______.Forty-five fathoms is marked on the anchor chain by __________.The Certificate of Inspection of a damaged tank barge has expired. What certificate authorizes the ...You are on a large vessel fitted with a right-handed controllable-pitch propeller set at maximum for...