The DEEP DRILLER is loaded as shown in the Sample Load Form #5 (Survival), when an unexpected, slowly increasing port list and bow down trim occurs. A leak in C1P is found. By deballasting from ballast tanks 2P and 3P, the inclination slowly decreases. The increase in the longitudinal free surface correction is _______.
A
0.90 foot
B
0.83 foot
C
0.57 foot
D
0.49 foot
E
İlgili Sorular
What is the TLV of cyclohexanol?What is required to launch a boat stowed in a crescent davit?INTERNATIONAL ONLY In a narrow channel, an overtaking vessel which intends to pass on the other vess...What danger is presented if a waterspout passes over a MODU?The SS AMERICAN MARINER has the following drafts: FWD 08'-04", AFT 15'-08". Upon completion of loadi...