The DEEP DRILLER is loaded as shown in the Sample Load Form #5 (Survival) when an unexpected slowly increasing starboard list and bow down trim occurs. A leak in 1S is found. By deballasting from ballast tanks 2S and 3S, the inclination slowly decreases. The increase in the longitudinal free surface correction is _________________.
A
1.25 feet
B
0.90 foot
C
0.83 foot
D
0.34 foot
E
İlgili Sorular
In the COASTAL DRILLER, VCG is obtained from the sum of the vertical moments by __________.Spaces protected by a fixed CO2 system must be equipped with an alarm which sounds ___________.A call between any two ship stations on an intership working frequency shall have a maximum duration...The effect of excessive catenary in shallow water may be __________.The Coordinator Surface Search (CSS) in a SAR situation should display by night __________.