The DEEP DRILLER is loaded as shown in the Sample Load Form #4 (Drilling). According to the deck load graph, how much additional deck load could be added on the unit?
A
561.87 long tons
B
461.87 long tons
C
281.34 long tons
D
192.59 long tons
E
İlgili Sorular
The buoy symbol printed on your chart is leaning to the northeast. This indicates __________.In the DEEP DRILLER, the transverse and longitudinal free surface moments for entry into the daily l...You are underway in an area where the charted depth is 8 fathoms. You compute the height of tide to...During an ocean tow when the winds are less than 70 knots, the maximum allowable KG for the COASTAL ...A towing hook may be released from the __________.