The DEEP DRILLER is loaded as shown in the Sample Load Form #3 (Preparing to Drill). If all the liquid mud (see table 8) is dumped, what would be the new height of the longitudinal metacenter?
A
61.13 feet
B
61.19 feet
C
61.22 feet
D
62.94 feet
E
İlgili Sorular
SOLAS requires a lifesaving training manual be provided in each crew cabin or in the __________.In very high latitudes, the most practical chart projection is the __________.The full period of motion of the DEEP DRILLER while tripping is 8 seconds and the maximum pitch angl...A hurricane moving northeast out of the Gulf passes west of your position. You could expect all of ...BOTH INTERNATIONAL & INLAND A pilot vessel may continue to sound an identity signal if she is _____...