The DEEP DRILLER is loaded as shown in the Sample Load Form #2 (Ballasting to Survival). What is the shift in LCG if 100.76 long tons of ballast are added to Ballast Tank #8S to replace the discharge of all bulk materials?

A
0.06 foot aft
B
0.14 foot aft
C
0.27 foot aft
D
0.40 foot aft
E