The COASTAL DRILLER, with no list, is at a true mean draft of 10 feet and 10 inches. LM is 1,699,463 ft-kips. Using only tanks #1, #25, and #26, how many kips of drill water must be transferred to level the jackup?
A
Transfer 106.2 kips aft from #1 to #25 and #26
B
Transfer 53.1 kips each from #25 and #26 forward to #1
C
Transfer 612 kips from #25 to #26
D
Vessel is level; no need to transfer
E
İlgili Sorular
The number of certificated able seamen and lifeboatmen required on a MODU is stated in the ________...In a burton rig, the dock boom can also be called the __________.A tropical cyclone has recurved and entered temperate latitudes. In the Northern Hemisphere when a ...If the low side bilge pump fails and the high side bilge pump has insufficient suction to dewater th...BOTH INTERNATIONAL & INLAND Two vessels meeting in a "head-on" situation are directed by the Rules t...