The COASTAL DRILLER, when underway was loaded as shown in Sample Load Form #1 (Rig Move). It is now preloaded at minimum air gap waiting for all settling to take place. The preload, weighing 7,191.7 kips, has LM 870,196 ft-kips and TM 2,158 ft-kips. What is the port leg reaction?
A
7,026 kips
B
7,099 kips
C
7,144 kips
D
7,180 kips
E
İlgili Sorular
The Master of a fishing vessel must ensure that each crew member participates in at least one fire d...You have berthed in a port area with other tank vessels. What signal is displayed by a vessel to ind...Which vessel is required to carry a Category I, 406 MHz§EPIRB installed to automatically float free ...You are in a lifeboat when you sight the stars indicated in illustration D007SA. You will be heading...As the South Equatorial Current approaches the east coast of Africa, it divides with the main part f...