The COASTAL DRILLER is loaded as shown in the Sample Load Form #1 (Rig Move). What is the new transverse free surface correction (FSCT) if the entire contents of drill water tanks 6 and 7 are discharged?

A
2.24 feet
B
2.14 feet
C
2.10 feet
D
1.67 feet
E