The COASTAL DRILLER is loaded as shown in the Sample Load Form #1 (Rig Move). If the drill water in drill water tanks #6 and #25 are discharged, what is the new draft?

A
8.26 feet
B
10.66 feet
C
10.88 feet
D
11.10 feet
E