The COASTAL DRILLER is loaded as shown in the Sample Load Form #1 (Rig Move). If the entire contents of the port pipe rack are back-loaded to an offshore supply vessel, how much drill water would have to be transferred between tanks 6 and 7 to level the vessel in list?

A
47.2 kips tank #7 to tank #6
B
23.6 kips tank #7 to tank #6
C
23.6 kips tank #6 to tank #7
D
47.2 kips tank #6 to tank #7
E