The COASTAL DRILLER is loaded as shown in the Sample Load Form #1 (Rig Move). If the entire contents of the port pipe rack are back-loaded to an offshore supply vessel, how much drill water would have to be transferred between tanks 6 and 7 to level the vessel in list?
A
47.2 kips tank #7 to tank #6
B
23.6 kips tank #7 to tank #6
C
23.6 kips tank #6 to tank #7
D
47.2 kips tank #6 to tank #7
E
İlgili Sorular
Which is a weekly publication advising mariners of important matters affecting navigational safety?When fruit is carried as refrigerated cargo, the most frequent cause of its being infected at the di...The wind velocity is higher in the dangerous semicircle of a tropical cyclone because of the _______...A temporary wire eye splice made with three wire rope clamps will hold approximately what percentage...Recurvature of a hurricane's track usually results in the forward speed __________.