The COASTAL DRILLER is loaded as shown in the Sample Load Form #1 (Rig Move). If the entire contents of the port pipe rack are back-loaded to an offshore supply vessel, how much drill water would have to be transferred from tank #1 to tank #26 to level the vessel in trim?

A
62.7 kips
B
64.4 kips
C
111.4 kips
D
114.9 kips
E