The COASTAL DRILLER is loaded as shown in the Sample Load Form #1 (Rig Move). If the entire contents of bulk tanks #2 and #3 are back-loaded to an offshore supply vessel, what would be the new draft?
A
11.04 feet
B
10.88 feet
C
10.72 feet
D
9.02 feet
E
İlgili Sorular
A vessel is entering port and has a Pilot conning the vessel. The Master is unsure that the Pilot i...The angle of loll is a stability term which applies to a floating MODU with ______________.A continual worsening of the list or trim of any floating MODU indicates _______________."Ice blink" is __________.INTERNATIONAL ONLY In a narrow channel, an overtaking vessel which intends to PASS on the other vess...