Safety is increased if _____________________.
A
extra line and wire are laid out on deck for emergency use
B
all lashings are made up, and the decks are clean and clear
C
power tools are kept plugged in for immediate use
D
spare parts are kept on deck for ready access
E
İlgili Sorular
The DEEP DRILLER, while loaded as shown in the Sample Load Form #5, discharges 137.88 long tons. The...Where should muster lists be posted?Drilling loads on the COASTAL DRILLER are the combined loads arising from conductor tension, rotary...The DEEP DRILLER is operating at the maximum allowable KGT at 60 feet draft. What is the value of GM...The stowage factor for a cargo is based upon __________.