In storm conditions, with the wind and waves from the port bow of the DEEP DRILLER in 600 feet water depth, the offset is 9%. Completely slacking mooring lines 5 and 6 reduces the offset to _____________.
A
0.065
B
0.05
C
0.025
D
0
E
İlgili Sorular
For vessels fitted with cargo gear, an initial test of the units under a proof load shall be conduc...The operator of an uninspected vessel MUST assist people affected by an accident if he or she can do...At least one reinspection shall be made on each vessel holding a Certificate of Inspection valid for...The DEEP DRILLER, loaded as shown in the Sample Load Form #4 (Drilling), discharges a non-liquid loa...A vessel is involved in a casualty. The cost of property damage includes the __________.