How should you signal the crane operator to hoist?
A
With forearm vertical and forefinger pointing up, move hand in small horizontal circles.
B
With arm extended downwards and forefinger pointing down, move hand in small horizontal circles.
C
Extend arm with fingers closed and thumb pointing upward.
D
Place both fists in front of body with the thumbs pointing upward.
E
İlgili Sorular
Your vessel's drafts are: FWD 24'-06", AFT 25'-04"; and the KG is 22.2 feet. Use the selected stabil...Due to the nature of a vessel's construction for a particular trade, it does not fully comply with ...The SS NORTHLAND is loaded to drafts: FWD 28'-06", AFT 29'-10". The KG is 27.4 feet. Use the salmon...Tropical cyclones do not form within 5° of the Equator because __________.The DEEP DRILLER, at 58.0 feet draft in sea water, discharges 200 long tons. What is the new displ...