Every U.S. crude oil tankship with a keel laying date on or after 1/1/75, shall be equipped with an inert gas system if the tonnage is more than _______________.

A
100,000 DWT (long tons)
B
100,000 DWT (metric tons)
C
50,000 DWT (long tons)
D
50,000 DWT (metric tons)
E