During loading and discharging operations, in addition to when the cargo tanks have been properly filled, each inert gas system must be capable of maintaining a minimum gas pressure of ________________.

A
150 millimeters of water pressure
B
125 millimeters of water pressure
C
100 millimeters of water pressure
D
75 millimeters of water pressure
E