Before operating a non-oceangoing ship greater than 100 gross tons it must have a fixed piping system to discharge oily mixtures ashore. This system must include_______________.
A
approved oily-water separating equipment
B
a fixed or portable containment system at the shore connection
C
a spare pump in case the main pump is inoperative
D
at least one outlet accessible from the weather deck
E
İlgili Sorular
You are maneuvering a vessel with a right-hand propellor. The rudder is amidships. The vessel will...Who completes the Declaration of Inspection before loading a tank vessel?A vessel must have one approved ring life buoy on board if its length is over how many feet?A tank with a volume of 2,000 cubic feet is pressed with fresh water weighing 62.4 pounds per cubic ...Inferior conjunction is possible for __________.