A vessel is loaded to her summer marks for a voyage from Montreal, Canada to Duluth, MN via the Great Lakes System. The voyage has been estimated to take nine (9) days. If the vessel departs Montreal on September 28th, which of the following statements is TRUE?
A
The vessel must be at her summer marks when she arrives at Duluth.
B
The vessel is in violation of the load line requirements.
C
The vessel's intermediate load line marks may not be submerged after September 30.
D
The vessel must be at her winter marks by the evening of the third day.
E
İlgili Sorular
The SS AMERICAN MARINER has on board 6080 tons of cargo with an LCG-FP of 270.71 feet. See the distr...You may be able to avoid loss of suction in a pump by __________.The SS AMERICAN MARINER will sail with the load shown. Use the white pages of The Stability Data Ref...Who must ensure that the emergency lighting and power systems on cargo vessels are operated at leas...In low latitudes, a first quarter Moon will always rise at about __________.